Solar and battery interconnect · Oahu

The electrical between your inverter and the grid

  • Licensed and insured in Hawaii
  • Oahu only
  • Written quote before work
A worker in a yellow hard hat and gloves runs a cable along a rooftop solar mounting rail.

The interconnection, in order

Six steps between the roof and the grid

Every system goes through them. Each step names who holds it.

  1. 01
    We draw it

    Step 1: A single-line diagram

    One page showing the panels, inverter, battery, disconnects and the point where the system meets your service. The permit and the utility both start from it.

  2. 02
    We file it

    Step 2: The city electrical permit

    We apply to the City and County of Honolulu's Department of Planning and Permitting with the diagram and the equipment sheets.

  3. 03
    We file it with the installer

    Step 3: The utility's interconnection application

    The utility reviews the design before it is built. What it asks for depends on the export program the system falls under, so we read the current rules first.

  4. 04
    We build it

    Step 4: Install, then the city inspection

    The AC disconnects, the battery's backup panel and the labels go in. The city inspector looks at the electrical.

  5. 05
    We send them

    Step 5: Documents back to the utility

    The inspection sign-off and the as-built diagram go back against the same application.

  6. 06
    The utility

    Step 6: Permission to operate

    The system stays off until the utility says in writing that it may switch on. Some homes get a new meter first. We tell you what the utility has said, and we cannot give you its date.

Two ways in

One set of steps, two different jobs

What changes between an installer sending a site and a homeowner adding a battery.

One set of steps, two different jobs
Homeowners with solarSolar installers
You bring usHomeowners with solarA system on the roof, or one on order, and a wish for backup powerSolar installersA site, the equipment list and the roof layout
We wireHomeowners with solarA backup panel for the circuits you pick, and what feeds itSolar installersThe AC side: disconnects, load center, meter socket, labels
The paperworkHomeowners with solarWe draw it, file the permit and the utility application, and keep you postedSolar installersWe draw the single-line and fill in the permit and utility forms you send us
Your first stepHomeowners with solarText a photo of your panel and your inverter's labelSolar installersSend a diagram or a plan set

Built for the islands

Salt air, sun and a long run to the panel

A system on a coastal roof ages differently from one inland. We wire it for that.

Roofs here take sun, salt and wind all year. We pick enclosures, fittings and supports for that, and say what we picked on the quote.

  • Enclosures and fittings rated for outdoor and coastal use

  • Conduit and supports that do not corrode where the air is salty

  • Labels that stay readable in full sun

  • Equipment ships to the island, so lead times go in the quote

A solar microinverter with its cables laid out on a white metal roof panel

What we wire

The electrical a solar and battery job needs

We do the electrical. Your installer, or you, supply the panels, the inverter and the battery.

  • Backup panel for a battery

    A subpanel with the circuits you chose to keep running when the grid is down.

    For homeowners
  • AC disconnects and the run

    The disconnect, the conduit and the wire between the inverter, the meter and the main panel.

    For installers
  • Meter socket and service

    A new socket or a bigger service when the house cannot carry the system as it stands.

    What we wire
  • The load check

    What the house draws, what the main panel can take, and where the battery should sit.

    What we wire
  • Labels and grounding

    The placards the inspector and the utility look for, and a bonding check at the panel.

    What we wire
  • A returned application

    We read the utility's comments, fix the diagram or the wiring, and send it back in.

    The utility steps

Licensed in Hawaii

The license on the work, and what it means

The class and number are in the footer of every page, and the state's license search shows them.

  • License

    • Electrical Contractor (C-13) · HI Lic. 000000 · Hawaii Contractors License Board

      The state class for electrical contracting. Look the firm up on the state license search.

  • What to check

    • Class · An electrical contractor class covers the wiring on a solar or battery job; roofing and panel mounting are separate trades.

    • Name and number · Search the firm's name or number on the state license search and compare it with the footer.

Sample reviews

What installers and homeowners say about the electrical side

“I sent a plan set on a Tuesday and got the single-line back marked up with what the utility would ask. The application went in without a question.”

Naomi R.Solar installer

“We added a battery to panels already on the roof. They told us which circuits it would carry and which it would not, before we signed.”

Kenneth O.Homeowner, Kailua

“The utility sent our application back with comments. They fixed the diagram, resubmitted, and texted me at every step.”

Nathan W.Homeowner, Pearl City

Sample reviews.

Service area

Where on Oahu we work

From Kapolei to Kahuku. If your address is not listed, send it and we will say.

A solar panel on a clay tile roof beside a stucco house and palm trees

Urban Honolulu

  • Honolulu
  • Kaimuki
  • Manoa

Windward side

  • Kailua
  • Kaneohe
  • Waimanalo

Central and leeward

  • Aiea
  • Pearl City
  • Waipahu
  • Mililani
  • Ewa Beach
  • Kapolei

North Shore and central

  • Wahiawa
  • Haleiwa
  • Kahuku

We work on Oahu only, not on Maui, Hawaii Island or Kauai.

Questions we get before the first call

Do you install the panels or the battery?

No. We do the electrical side: the disconnects, the backup panel, the meter work and the paperwork. Your installer, or you, supply the equipment.

Who files with the utility?

Whoever the owner and the installer agree on, named on the application. We prepare the diagram and the forms either way.

How long does the utility take?

It sets its own review time, and it changes. We tell you where the application stands each time the utility updates it.

Can the system run before the utility approves it?

No. The utility's written permission to operate comes first, and we leave the system off until we have it.

What if the application comes back?

We read the comments, change the diagram or the wiring to answer them, and resubmit. The change goes in your quote before we do it.

Start with a page

Send the single-line diagram, or a photo of the panel

A diagram, a plan set, or just a photo of your main panel and your inverter's label is enough to begin.